Project Development Workflow Tasks (PDWT)
PART 3: Identify Project Need And Project Initiation Document
I. Identify Project Need
A. Project Initiation and Planning (100.05.05)
Initiation
II. Project Initiation Document
A. Define Transportation Need and Assess Site (150.05)
Obtain and Review Existing Reports, Studies and Mapping (150.05.05) --- Tasks P08 - P26 ---
- P08 - Establish Project Files
- P09 - Request Appropriate Planning Documents
- P10 - Review Existing Freeway Agreement or Controlled Access Highway Agreement
- P11 - Verify Special Route Designations
- P12 - Obtain FEMA/FIRM Maps
- P13 - Obtain As-Builts
- P14 - Obtain Righy of Way Maps
- P15 - Perform Encroachment Permit Review
- P16 - Request Mapping
- P17 - Obtain Highway Inventory Photos
- P18 - Request GIS Mapping Information
- P19 - Request Information for Local Agencies
- P20 - Obtain Pavement Condition Survey Report
- P21 - Obtain STRAIN Report
- P22 - Obtain Traffic Concept Report
- P23 - Review Related or Adjacent Studies
- P24 - Develop Strip Map (150.10.15 Develop Concept Alternatives)
- P25 - Prepare for Field Review
- P26 - Conduct Field Review
Define Problem (150.05.35)--- Task P27 ----
Identify Environmental Constraints (150.05.20) --- Task P28 ---
B. Develop Initial Alternatives ( WBS 150.10)
Develop Concept Alternatives (WBS 150.05.15 - Early Tasks)--- Tasks P29 - P30 ---
Obtain Public Input (WBS 150.10.05)--- Task P31 ---
Perform Value Analysis (WBS 150.10.10)--- Task P32 ---
Develop Concept Alternatives (WBS 150.10.15)--- Tasks P33 - P59 ---
- P33 - Review for Application of Standards
- P34 - Develop Initial Alternatives
- P35 - Prepare Base Layouts for Concept Geometrics
- P36 - Prepare Preliminary Geometric Approval Drawings
- P37 - Request Traffic Information
- P38 - Request Pavement Deflection Study
- P39 - Request Preliminary HOV Report/Study
- P40 - Request Preliminary Materials Report
- P41 - Request Preliminary Geo-technical Design Report
- P42 - Request Accident History TASAS Table B
- P43 - Request Safety Analysis
- P44 - Request Safety Index Calculation
- P45 - Request Delay Index
- P46 - Request HT65 Accident Investigation
- P47 - Request Median Barrier Rail Warrant
- P48 - Request Structures Advance Planning Study
- P49 - Request Signal Warrants
- P50 - Request Traffic Management Plan
- P51 - Request Signs and Striping Review & Estimate
- P52 - Request Traffic Management Plan
- P53 - Request COZEEP Estimate
- P54 - Request Landscape Architecture Review
- P55 - Request Preliminary Hydraulic Review
- P56 - Prepare Preliminary Environmental Study Limits
- P57 - Request Preliminary Environmental Analysis Report (PEAR)
- P58 - Request Hazardous Materials Initial Site Assessment
- P59 - Request Pumping Plant Recommendation
C. Draft Agreements ( WBS 205.)
Obtain Freeway Agreement (WBS 205.20) --- Task P60 ---
Obtain Maintenance Agreement (WBS 205.20)--- Task P61 ---
Preliminary Cooperative Agreement (WBS 205.35)--- Task P62 ---
D. Analyze Alternatives (WBS 150.15)
Prepare R/W Data Sheets (WBS 150.15.05)--- Tasks P63 - P64 ---
Assess Utility Relocation Requirements (WBS 150.15.10)--- Task P65 ---
Determine Railroad Involvement (WBS 150.15.15)--- Task P66 ---
Prepare and Obtain Approval for Design Exceptions (WBS 150.25.10)--- Tasks P67 - P68 ---
- P67 - Request Exception(s) and Approve Preliminary GAD
- P68 - Obtain Federal Highway Administration (FHWA) Approval
Develop Cost Estimates (WBS 150.15.55)--- Tasks P69 - P72---
E. Prepare and Approve PID (WBS 150.25)
Prepare Draft PID (WBS 150.25.05)--- Tasks P73 - P75 ---
Prepare Storm Water Data Report (WBS 150.25.25)--- Task P76 ---
Circulate, Review and Approve PID (WBS 150.25.20)--- Tasks P77 - P89 ---
- P77 - Perform Draft PID Constructibility Review
- P78 - Prepare Functional Unit Project Fact Sheets
- P79 - Prepare Functional Unit(s) Workplan Estimate
- P80 - Identify and Estimate Consultant Effort
- P81 - Develop Consultant Contract Cost Estimate
- P82 - Incorporate Capital Outlay Support Estimate
- P83 - Circulate Draft PID for Internal Reviews
- P84 - Perform Task Force Field Review
- P85 - Circulate Draft PID for External Reviews
- P86 - Revise Draft PID
- P87 - Circulate PID for Signature
- P88 - Distribute Approved PID
- P89 - Complete Project Files