Inquiry #1: The cross sections provided for this project have both a different contract number and project identity number, but the correct PMs. Please clarify if these are the correct cross sections we should be using for take-offs or if a new set will be provided.



Inquiry submitted 02/05/2013

Response #1:The contract number on the cross sections provided are correct and these documents should be used for take-offs.
Response posted 02/06/2013




Inquiry #2: The project "Amendments to Standard Specifications" added section 6-1.085 Buy America. I do not see a Federal aid number within the specifications.

Please confirm that this project is NOT subject to the "Buy America" material requirement for steel products.

Inquiry submitted 02/06/2013

Response #1:SSP 6-1.085 Buy America is an amendment to the Standard Specifications. Since there is not Federal Aid, this section does not apply.
Response posted 02/07/2013




Inquiry #3: There are a substantial amount of trees within the right of way not shown on the plans that will conflict with the proposed improvements. Are these to be removed by others prior to starting work or is it the Contractor’s responsibility to remove them?
Inquiry submitted 02/14/2013

Response #1:Submitted for consideration.
Response posted 02/15/2013


Response #2:Removal of trees is paid for under Item 26, Clearing and Grubbing.
Response posted 02/21/2013




Inquiry #4: Stage 1 construction has the Contractor building the north side of SR 216 (WB) with EB & WB traffic on the south side of SR 216 (EB). Between Sta. +/- 33+00 – 43+00 and Sta. +/- 54+00 – 62+00 the pavement is not wide enough to carry 2 lanes as shown on Stage Construction plan sheets SC-2 thru SC-4. Will the Contractor be paid to construct temporary pavement to accommodate traffic as shown on the Stage Construction plans?
Inquiry submitted 02/14/2013

Response #1:Submitted for consideration.
Response posted 02/15/2013


Response #2:Adequate paved roadway is available for staging and temporary pavement is not required.

Response posted 02/21/2013




Inquiry #5: Are the magnetic detector elements with attached cables State Furnished?
Inquiry submitted 02/20/2013

Response #1:Submitted for consideration.
Response posted 02/21/2013


Response #2:No. Per section 10-3.18 DETECTORS of the project Special Provisions:

Magnetic detector sensing elements shall be Model 231, shall conform to Chapter 5, Section 3 of the Transportation Electrical Equipment Specifications (TEES), and shall be listed on the Pre-Qualified Products List for traffic signal control equipment at: http://www.dot.ca.gov/hq/traffops/elecsys/QPL.htm
Response posted 02/22/2013




Inquiry #6: Is the Bark shown in the Tree Wells on Sheet C-5 the same material as the Mulch in the Median Islands? Is it paid under Item 31, Mulch?
Inquiry submitted 02/21/2013

Response #1:Submitted for consideration.
Response posted 02/21/2013


Response #2:Mulch shown on C-5 in tree wells is the same material as in the median islands, as is paid under Item #31, Mulch.
Response posted 02/25/2013




Inquiry #7: Is it the intent to require Method Compaction for the HMA (Superpave) on this project? Based on the first paragraph on Page 135 of Section 10-1.30, Hot Mix Asphalt (Superpave), Method Compaction would not apply because the specified thickness is over .20’.
Inquiry submitted 02/21/2013

Response #1:Submitted for consideration.
Response posted 02/21/2013


Response #2:The compaction would be Standard Method and Method Compaction is not applicable.
Response posted 02/22/2013




Inquiry #8: HMA Sction 10-1.30:

This project has a Quality control binder of plus or minus 0.3%. Per the Rock Products Committee the binder tolerance has been adjusted to plus or minus 0.5% (Section 39 Superpave 02-09-2013). Will there be an amendment to address this change?? If not will there be a no-cost change or Construction Policy Directive to address this change post bid?

Thank You

Inquiry submitted 03/05/2013

Response #1:Submitted for consideration.
Response posted 03/05/2013


Response #2:Bidder Inquiry is incorrect in tolerance stated. Bid per plans and specifications.
Response posted 03/12/2013




Inquiry #9: Per Addendum #2 on Sheet Q-2 and Sheet C-7 15.5CY and 15.5TN (respectively) of conc curb (Type A2-6) are shown. Sheet C-8 also shows a curb to be installed, but it is Type (B1-6). Which curb is to be constructed type A2-6 or B1-6, and which qty is the state using 15.5 TN or 15.5 CY?
Inquiry submitted 03/05/2013

Response #1:Submitted for consideration.
Response posted 03/05/2013


Response #2:Minor Concrete (Misc. Construction) is paid as cubic yards(CY) as shown in Addendum 2, dated March 5, 2013, plan sheet Q-2 and Section 10-1.39 Miscellaneous Concrete Construction of the special provisions.
Response posted 03/12/2013




Inquiry #10: Will the parking lot addition and the Lover's Lane reconstruct construction be done following the Caltrans plans and specifications, or will they follow the City of Visalia Standards?
Inquiry submitted 03/11/2013

Response #1:Submitted for consideration.
Response posted 03/12/2013


Response #2:This project should be constructed as per contract documents as advertised.

Response posted 03/13/2013




Inquiry #11: The typical sections and cross sections show the existing Cold plane asphalt at a depth between .4' and 1'. If the section is at .4' thick will the underlying section need to be processed, or can it simply be rolled and paved over?
Inquiry submitted 03/11/2013

Response #1:Submitted for consideration.
Response posted 03/12/2013


Response #2:Removal of existing Asphalt Concrete pavement and constructing grading plane shall conform to Section 10-1.22 Earthwork of special provisions. Recommend bid per plans and specifications.

Response posted 03/13/2013




Inquiry #12: In phase 6 it appears that a portion of the cobble median and curb and gutter on Lover's lane is to be removed and a B1-6 is to be placed cleanly next to the Cobble median that is left in place. How is the state paying for the Cobble median that will be placed back, as their will not be clean lines to butt the new Curb and gutter against?
Inquiry submitted 03/11/2013

Response #1:Submitted for consideration.
Response posted 03/12/2013


Response #2:Care should be taken when removing the necessary portion of the Cobble median. Any necessary repair should be included in the price to place the B1-6 curb.
No additional payment will be made. Bid per plans and specifications.
Response posted 03/19/2013




Inquiry #13: Can Caltrans provide a demolition plan for the trees that are to be removed, as well as, the sound walls to be removed and replaced?
Inquiry submitted 03/13/2013

Response #1:Submitted for consideration.
Response posted 03/13/2013


Response #2:Tree removal shall conform to Section 16 of Standard Specifications and removal of Masonry Wall shall conform to Remove Concrete (page 95) of the special provisions. Recommend bid per plans and specifications.

Response posted 03/19/2013




Inquiry #14: There is an existing decorative masonry wall with rolling steel gates at +/- Sta. 9+20 that appears to be within the R/W based on the stakes currently placed. What is to be done with this? It does not show on the plans.
Inquiry submitted 03/13/2013

Response #1:Submitted for consideration.
Response posted 03/13/2013


Response #2:Bid as shown on plans and specifications.
Response posted 03/19/2013




Inquiry #15: Is the curb in the parking lot B1-6 or A2-6? It is noted as being B1-6 on Sheet C-8. It is drawn like A2-6 on the plan view and is noted as being A2-6 in the quantity chart on Sheet C-7. Please clarify.
Inquiry submitted 03/13/2013

Response #1:Submitted for consideration.
Response posted 03/13/2013


Response #2:Bid as shown on plans and specifications.
Response posted 03/19/2013




Inquiry #16: There are several wood fences within the R/W that conflict with construction and are not shown on the plans. What is to be done with these?
Inquiry submitted 03/13/2013

Response #1:Submitted for consideration.
Response posted 03/13/2013


Response #2:Recommend bid as per plans and specifications.These fences are scheduled to be removed prior to construction.

Response posted 03/19/2013




Inquiry #17: The staging plans are lacking. There is not a item for temporary striping. Since traffic will be pushed to different lanes for construction, how does Caltrans wish to handle this item? Nor is there an item for channelizers. I would think at the very least there would be a quantity and a pay item for theses item.
Inquiry submitted 03/17/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:Temporary striping is not required. Construction activities will be handled using Temporary Traffic Control systems (cones, barricades etc.).
Response posted 03/19/2013




Inquiry #18: Will k-rail be needed for construction? There does not appear to be enough clearance from the work to the travel way.
Inquiry submitted 03/17/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:Please refer to Section 10-1.01 Order of Work of the special provisions.
Response posted 03/19/2013




Inquiry #19: Is there any time limit for the exposure to the school playground? Will the school require a temp chain link fence be installed?
Inquiry submitted 03/17/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:Recommend bid per plans and specifications.
Response posted 03/19/2013




Inquiry #20: Inquiry #4, asked if temp pavement will be needed for staging. If you look at your revised plan sheet SC-2, it shows the edge of pavement as a dotted line, the traffic will running through front yards on dirt or the sheets need to be revised.
Inquiry submitted 03/17/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:Adequate paved roadway is available for staging and temporary pavement is not required.
Response posted 03/19/2013




Inquiry #21: Does Caltrans have any construction easements for this project? The plans do not show any construction easements.
Inquiry submitted 03/17/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:No further information is available at this time. Please bid per the contract documents.
Response posted 03/19/2013




Inquiry #22: Please add a stage quantity sheet.
Inquiry submitted 03/17/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:No further information is available at this time. Please bid per the contract documents.
Response posted 03/19/2013




Inquiry #23: Inquiry #13, the demo on this project is extensive. There needs to be a demo plan so the bidders know exactly what needs to be removed.
Inquiry submitted 03/17/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:No further information is available at this time. Please bid per the contract documents.
Response posted 03/19/2013




Inquiry #24: Please show in the staging plans where and how many CMS's Caltrans will require for this project.
Inquiry submitted 03/17/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:No further information is available at this time. Please bid per the contract documents.
Response posted 03/19/2013




Inquiry #25: In addition to Inquiry #16, how are these to be paid for? The remove fence item? If so, please revise the quantity.
Inquiry submitted 03/17/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:No further information is available at this time. Please bid per the contract documents.
Response posted 03/19/2013




Inquiry #26: On the staging plans for the above referenced project there are 8 stages identified and subsequent traffic handling plans. However it does not appear that there is any temporary striping or removal. Is Caltrans going to quantify the traffic handling temporary striping item and add the appropriate bid items??
Inquiry submitted 03/18/2013

Response #1:Submitted for consideration.
Response posted 03/18/2013


Response #2:No further information is available at this time. Please bid per the contract documents.
Response posted 03/19/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.