Inquiry #1: What rock grading class does Caltrans want for Item 51?
Inquiry submitted 03/14/2013

Response #1:3/14/13: Your inquiry has been received and is being reviewed. Thank you for your patience.
Response posted 03/14/2013


Response #2:3/15/13: Please refer to the Special Provisions, Section 72-2.02A (page 35) and sheet D-1 (page 20 of 47) of the contract plans.

Response posted 03/15/2013




Inquiry #2: station 19+00to 28+00 shows new section in place of old section..also, other areas show same profile. do these sections need to be ground or removed? if so, i will place in fill.

Inquiry submitted 03/26/2013

Response #1:3/28/13: Please refer to Section 19-2 Roadway Excavation and Section 19-6 Embankment Construction of the 2010 Standard Specifications.
Response posted 03/28/2013




Inquiry #3: I didn't note a street sweeping item or any reference to a cpm schedule
Inquiry submitted 03/27/2013

Response #1:3/28/13: Your inquiry is under review. Please note that due to the current time frame between the inquiry submittal and the bid opening date, a response may not be provided before the bid opening. If a response is not provided before the bid opening addressing your concern, please bid per the current contract documents. Thank you for your patience.
Response posted 03/28/2013


Response #2:3/28/13: Please refer to the following Sections of the 2010 Standard Specifications: Section 13-7.03D Street Sweeping, Section 8-1.02C Level 2 Critical Path Method and Section 9-1.03 Payment Scope.
Response posted 03/28/2013




Inquiry #4: Section 72-2.02A states that Rock shall be excavated from the Hess Road Mainentance Station. Is this for all the RSP on the project including the "Small-RSP"? Is the contractor to remove all the rock from the Hess Road location, even the rock outside the cut lines? Only asking this because it appears that some of the rock has already been "Salvaged" by somebody and there is not much left if we are only excavating rock inside the cut lines. If the contractor is to obtain additional RSP for Method B contsruction what size shall it be?
Inquiry submitted 04/01/2013

Response #1:4/2/13: Your inquiry is under review. Please note that due to the current time frame between the inquiry submittal and the bid opening date, a response may not be provided before the bid opening. If a response is not provided before the bid opening addressing your concern, please bid per the current contract documents. Thank you for your patience.
Response posted 04/02/2013


Response #2:4/2/13: For the class of rock to be used from the Hess Road Maintenance Station, please refer to Note 2 on sheet D-1 (page 20 of 47). Please bid per the current contract documents.
Response posted 04/02/2013




Inquiry #5: Can the road be closed to through traffic between Baker and Monroe?
Inquiry submitted 04/01/2013

Response #1:4/2/13: Your inquiry is under review. Please note that due to the current time frame between the inquiry submittal and the bid opening date, a response may not be provided before the bid opening. If a response is not provided before the bid opening addressing your concern, please bid per the current contract documents. Thank you for your patience.
Response posted 04/02/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.