Divison of Construction

Construction Procedure Directives (CPDs)

List of Eliminated Construction Procedure Directives

CPD Number
Subject
Date
Supplemental Information
CPD 17-1 Permanent Pedestrian Facilities Inspection Training [pdf] 07/14/2017

 

CPD 16-14 Reinstatement of SRT Systems and Rescission of Construction Procedure Directive 16-11 [pdf] 10/31/2016

Attachment: Division of Traffic Operations Memorandum, “Reinstatement of Use of SRT Systems,” dated October 28, 2016

Supersedes CPD 16-11

CPD 16-13 Bridge Deck Crack Prevention [pdf] 10/11/2016


Attachment 1: Sample CEM-4903, “Change Order Memorandum”

Attachment 2: Sample CEM-4900, “Change Order”

Attachment 3: Change Order Attachment—Bridge Deck Crack Prevention Specifications

Attachment 4: Division of Engineering Services Memorandum, “Construction Specifications for Bridge Deck Crack Prevention,” dated August 11, 2016

Attachment 5: FHWA Form CA-358 (c), “Record of Blanket Prior Approval for Major Contract Change Order”


CPD 16-12 G-12 Funds Request Memorandum [pdf] 10/07/2016



CPD 16-10 Americans With Disabilities Act Compliance in Construction [pdf] 07/26/2016



CPD 16-8 Hot Mix Asphalt with Reclaimed Asphalt Pavement [pdf] 06/22/2016

Attachment 1: Example Blending Charts

Attachment 2: Sample Change Order Memorandum—Asphalt Binder Blending Charts

Attachment 3: Sample Change Order—Asphalt Binder Blending Charts

Attachment 4: Asphalt Binder Blending Charts, FHWA Form 358(c), “Record of Blanket Prior Approval for Major Contract Change Order”

Attachment 5: Sample Change Order Memorandum—New Job Mix Formula (JMF) Based on Maximum Reclaimed Asphalt Pavement Binder Ratio (RPBR) 

Attachment 6: Sample Change Order—New JMF Based on Maximum RPBR

Attachment 7: Sample Backup Calculations to Support Agreed Unit Price for Replacing Reclaimed Asphalt Pavement Aggregate with Virgin Aggregate

Attachment 8: New JMF Based on Maximum RPBR, FHWA Form 358(c), “Record of Blanket Prior Approval for Major Contract Change Order”
CPD 16-7 Shortage of Material—Fly Ash [pdf] 05/24/2016  
CPD 16-5 Rebates for Reducing Water Usage [pdf] 05/3/2016  
CPD 16-4

Authorization to Proceed for Ordered Extra Work [pdf]

4/5/2016

 

CPD 16-3

Extra Work Bill Review [pdf]

4/5/2016

 

CPD 16-1

Bidder Inquiries [pdf]

1/4/2016

 

CPD 15-5

Water Conservation — Implementation of Caltrans’ 2015 Drought Action Plan Commitments [pdf]

12/7/2015

Attachment 1: Sample Change Order Memorandum—Delay Highway Planting

Attachment 2: Sample Change Order—Delay Highway Planting

Attachment 3: Sample Change Order Memorandum—Delete Highway Planting

Attachment 4: Sample Change Order—Delete Highway Planting

Attachment 5: FHWA Form 358(c), “Record of Blanket Prior Approval for Major Contract Change Order”—Delay Highway Planting

Attachment 6: FHWA Form 358(c), “Record of Blanket Prior Approval for Major Contract Change Order”—Delete Highway Planting

CPD 15-4 Recycled Water Usage for Landscaping [pdf] 12/1/2015

Attachment 1: Sign S28(CA) “USING RECYCLED WATER” details

Attachment 2: Sample Change Order Memorandum for Recycled Water Information Signs

Attachment 3: Sample Change Order for Recycled Water Information Signs

Attachment 4: FHWA Form 358(c), “Record of Blanket Prior Approval for Major Contract Change Order”

 

CPD 15-3 Proper Charging for Stormwater Contract Administration Work [pdf] 5/28/2015

 

CPD 15-2 Final Materials Certification Form [pdf] 5/26/2015

 

CPD 15-1 Stormwater Program—Construction Compliance Evaluation Plan [pdf] 3/25/2015

 

CPD 14-10 Suspension of the ET-Plus, ET-Plus 31, ET-2000 Plus, and ET-2000 [pdf] 11/14/2014

Attachment: Traffic Operations Memorandum, “Suspension of the ET-Plus, ET-Plus 31, ET-2000 Plus, and ET-2000, dated November 14, 2014

CPD 14-9 Flagging Instuction Handbook [pdf] 10/29/2014

 

CPD 14-8 Portable Transverse Rumble Strips [pdf] 10/29/2014

Attachment: Traffic Operations Memorandum, “Implementation of Portable Transverse Rumble Strips,” dated September 18, 2014

CPD 14-6 Guidance for the Work Breakdown Structure and Workplan Standards Guide [pdf] 07/10/2014

 

CPD 14-5 Construction Resource Estimating Norms [pdf] 07/10/2014

 

CPD 14-4 Coefficient of Friction Testing on Bridge Deck Methacrylate Resin Treatments and Polyester Concrete Overlays [pdf] 06/17/2014

Attachment 1: Sample Change Order Memorandum (Bridge Deck Methacrylate Resin Treatment)
Attachment 2: Sample Change Order (Bridge Deck Methacrylate Resin Treatment)

Attachment 3: FHWA Form CA-358(c), “Record of Blanket Approval for Major Contract Change Order” (Bridge Deck Methacrylate Resin Treatment)

Attachment 4: Sample Change Order Memorandum (Polyester Concrete Overlay)
Attachment 5: Sample Change Order (Polyester Concrete Overlay)
Attachment 6: FHWA Form CA-358(c), “Record of Blanket Approval for Major Contract Change Order” (Polyester Concrete Overlay)

CPD 14-2 Code of Safe Practices [pdf] 04/10/2014 Supersedes CPD 10-11
CPD 14-1 Water Conservation [pdf] 03/04/2014
CPD 13-10 Implementation of Automated Machine Guidance for Ongoing Projects [pdf] 11/12/2013
CPD 13-9 Construction Records Retention and Storage [pdf] 10/24/2013  
CPD 13-6 Local Agency Fees, Permits, and Services [pdf] 08/05/2013  
CPD 13-5 Contractor Option to use up to 25 Percent Reclaimed Asphalt Pavement in Hot Mix Asphalt [pdf] 08/02/2013
CPD 13-4 Hot Mix Asphalt Optimum Bitumen Content Based on Total Weight of the Mix [pdf] 07/15/2013
CPD 13-3 Construction Support Planning, Managing, and Charging Practices [pdf] 06/04/2013  
CPD 13-1 Salvaged or Surplus Material [pdf] 04/19/2013
CPD 12-2 Contractor Option for Use of Warm Mix Asphalt Technologies in Hot Mix Asphalt [pdf] 06/07/2012
CPD11-3 Use of the California Highway Patrol in Construction Work Zones [pdf] 08/24/2011  
CPD11-2 Grandfathered Risk Level 1 Projects [pdf] 07/22/2011
CPD10-12 Interviews with Contractor Personnel [pdf] 09/09/2010  
CPD10-1 Small Business Utilization Report Pilot Program Extension [pdf] 02/25/2010  
CPD 09-9 Charges for Restaking Rate [pdf] 08/13/2009  
CPD 09-3 Small Business Utilization Report [pdf] 04/10/2009
CPD 09-2 Temporary Sales and Use Tax Increase -Assembly Bill 3 (Evans)[pdf] 04/02/2009  
CPD 08-9 Hot Mix Asphalt Specifications Evaluation [pdf] 09/29/08  
CPD 08-8 Worker Certification Requirements [pdf] 09/11/2008  
CPD 08-7 Options for Meeting California Test 371 Requirements for Rubberized Hot Mix Asphalt-Gap
Graded [pdf]
09/18/2008
CPD 08-2 Pavement Asphalt Concrete Reporting System [pdf] 06/25/2008
CPD 08-1 Day After Thanksgiving - Nonworking Day [pdf] 02/29/2008  
CPD 06-11 Performance Graded Polymer Modified Asphalt [pdf] 11/21/2006 Attachment 1 [pdf]
Attachment 2 [pdf]
Attachment 3 CCO Memo [pdf]
Attachment 3 CCO Memo [doc]
Attachment 4 [pdf]
Attachment 4 [doc]
Attachment 5[pdf]
CPD 05-13 Effects of Assembly Bill 574, Recycled Concrete [pdf] 12/29/2005  
CPD 05-10 Performance Graded Paving Asphalt [pdf] 11/10//2005 Attachment 1 [pdf]
Attachment 2 [pdf]
Attachment 3 [pdf]
Attachment 4 [pdf]
CPD 05-4 Rescind CPD 03-8 (Reinforcing Steel Shortage) [pdf] 04/27/2005  
CPD 04-6 Application of the Tunnel Safety Orders [pdf] 05/10/2004 Attachment 1 [pdf]
CPD 02-3 Damage Claim Standard Special Provisions (SSP) Revision [pdf] 8/23/2002  
CPD 01-14 Quality of Traffic Control Devices [pdf] 11/29/2001  
CPD 01-11 Hoisting Operations near Public Traffic and Pedestrians [pdf] 9/17/2001 Attachment 1 [pdf]
Attachment 2 [pdf]
CPD 01-04 Respirator Work during Rubberized Asphalt Concrete (RAC) and Performance Bond Asphalt (PBA) Paving [pdf] 7/3/2001 -
CPD 01-02 Industrial Work Order 16 and Assembly Bill 60 [pdf] 2/28/2001 -
CPD 00-11 Overtime Policy for Construction Employees [pdf] 9/27/2000 General Guidelines [pdf]
CPD 00-3 Caltrans Test 360 - Surface Abrasion [pdf] 5/11/00 sample CCO memo[pdf]
sample CCO[pdf]
CPD 99-2 Compaction Requirements on Shoulders with Rumble Strips [pdf] 11/22/99 sample CCO memo [pdf]
sample CCO [pdf]
FAQs