Additional Links
District 3 and North Region Projects
Butte
70/149/99 - Highway Improvement Project Currently Under Construction (Updated 1/07)Upgrade two-lane State Route 149 to a four-lane expressway between State Route 70 and State Route 99 (4.6 mi) and construct freeway-to-freeway interchanges at the SR 70 and 99 intersections.
El
Dorado 50 - Shingle Springs Interchange Currently Under Construction
Construction, operation and maintenance
of an interchange in El Dorado County to serve the existing
Shingle Springs Rancheria.
El
Dorado 50 - High Occupancy Vehicle Lanes
Add two high-occupancy vehicle
(HOV, or carpool) lanes (one eastbound and one westbound)
in the median of U.S. 50 in western El Dorado county
from the El Dorado Hills Blvd. Undercrossing to South
Shingle Road/Ponderosa Rd Overcrossing. Includes bridge
modifications, lighting improvements, new overlay and
CHP enforcement area.
I -5 Elk Grove Blvd to Downtown Sacramento Bus-Carpool Lane Project ![]()
The California Department of Transportation (Caltrans), in partnership with the Federal Highway Administration (FHWA) and the Sacramento Transportation Authority (STA), is proposing to add approximately 13 miles of Bus/Carpool Lanes (also known as High Occupancy Vehicle or HOV lanes) on Interstate 5 (I-5) in both directions in Sacramento County, from about one mile south of Elk Grove Boulevard to U.S. Highway 50.
I -80 Across The Top Bus-Carpool Lane Project ![]()
The proposed project will construct bus/carpool lanes in the median of Interstate 80, in both directions, from west
of West El Camino Avenue
to Watt Avenue (approximately 10 miles).

Placer
65 - Lincoln Bypass
Construct a four-lane freeway
around the City of Lincoln, in Placer County. The project
begins 0.3 km (0.5 mile) south of Industrial Blvd. and
ends near Riosa Rd.
Sacramento Area Bus/Carpool Lane Improving Mobility in the Sacramento Region![]()
Bus/Carpool lanes, also known as HOV (High Occupancy Vehicle) lanes and diamond lanes, are effective transportation system management tools for reducing traffic congestion and improving mobility. .
Sac50 Bus/Carpool Lane and Community Enhancements Project (Updated 01/07)
Proposed project would add bus/carpool lanes in the existing median of U.S. Highway 50 from Sunrise Boulevard to downtown Sacramento.
Sac/Plac I-80
Operational & Capacity Improvement Project (Updated 07/07)
This State Transportation Improvement Project on Interstate 80 (I-80) in Sacramento and Placer Counties is a 5.8 mile project that will increase freeway capacity, improve safety, and improve traffic flow from approximately one-half mile west of the Sacramento/Placer County line to approximately one mile east of the State Route 65 connector in Placer County.
Sutter
99 - Safety and Operational Improvement
Highway improvement project on
State Route 99 in Sutter County, between the SR99/70
junction to Sacramento Ave. and from Central Ave. to
O'Banion Rd. Widen SR99 to a 4-lane facility with continuous
median and left-turn lanes.
Yolo 16 and Kentucky Ave Signailzed Intersection Project ![]()
Install a signalized intersection to provide safety improvements and enhance traffic operations at the intersection of State Route 16 and Kentucky Avenue in Woodland, CA.
Yolo
16 - Safety Improvements/Traffic Calming (Updated 11/07)
Safety improvement project on
State Route 16 in Yolo County, between the town of Brooks,
and Interstate 505. Traffic calming projects within
the towns of Capay and Esparto
